BYTEENGINEERING & OEM
PRODUCTION VISIBILITY v2.0.0Upgrade history & original versions

Launch production Demo · v2.2.0

ENGINEERING HANDOFF / THE WORK BEFORE THE WORK

Less redrawing.
More engineering.

From incoming 2D drawings to a reviewed 3D model, department-specific documents and manufacturing preparation. Make the repeated work visible—and measure what an improved handoff actually saves.

Workflow upgrade conceptBased on the reported handoff process. The improved flow is proposed, not a verified factory deployment. This exhibit does not convert CAD files or generate NC programs.

01 / LOCATE THE REPETITION

Follow the handoff.
Inspect what each step needs.

The reported bottleneck is real feedback; the detailed roles and review checkpoints below are a proposed working map to confirm with the team.

02 / ONE MASTER, DIFFERENT NEEDS

Give each recipient
the information they need.

Reuse a reviewed model and structured requirements. Produce the required 2D views where the recipient still needs them; do not assume every supplier can consume a 3D model with manufacturing annotations.

03 / MEASURE THE CHANGE

How much engineering time
did the change actually recover?

Compare the same work package and scope. Enter person-minutes, including rework and verification. Blank means unknown—not zero. Use anonymized references.

Person-minutes for one comparable work package · enter total team effort, not elapsed lead time
ActivityBeforeAfterDifference

Example numbers are fictional. Edits stay in this tab until exported; they are not uploaded.

Total effort beforeNot measured
Total effort afterNot measured
Net effort recoveredNot measured
Net reductionNot measured

No measured savings recorded.

Repetitive preparation, NC planning and verification are counted separately so extra engineering effort is not hidden.

Quality observations are self-recorded context. Less preparation time does not establish NC accuracy, lower defect rates or shorter delivery lead time.

04 / KEEP THE ENGINEERING IN THE LOOP

Reduce repetition.
Keep the decisions.

The proposed improvement is to prepare information once, derive the right views and make changes traceable. Engineers still decide how the part can be manufactured and how the result will be verified.

Geometry & intent

Resolve missing dimensions, hidden geometry, units and design requirements before accepting a reconstructed model.

Views & requirements

Review the selected views, datum references, tolerances, surface requirements and revision before releasing recipient packages.

Manufacturing & NC

Confirm setup, tooling and workholding; verify toolpaths and machine-specific output; define first-piece inspection as applicable.

05 / KEEP THE LEARNING VISIBLE

Every upgrade has a reason.
Every original stays accessible.

v1.0.0 / ORDER VISIBILITY

Where is my order?

Three interactive situations: on schedule, material delay and quality hold. Includes a recovery comparison and copyable buyer update.

Open original v1.0.0 & operate
v2.0.0 / ENGINEERING HANDOFF

Where does engineering time go?

Adds the 2D–3D–drawing handoff, recipient-specific information, before/after effort records and reopenable exports.

Explore current v2.0.0

Both new exhibits were first released together. Their feature versions are separate from the website publication version.

Make the next order easier to explain.

Start with one representative part, its drawing revision and the handoffs that consume the most time.

Discuss the workflow for your part
3D Production lineFactory workspaceTake the orderVersionCentral admin