TCM / ENGINEERING → DELIVERY
Inside the production system
How is my revision controlled?
The documented workflow starts with CAD/CAM. Submit the required drawing revision and approval requirements for confirmation; the source does not document the software’s revision-control rules.
How is progress reported?
The source shows dispatch from scheduling to the shop floor and actual machining progress returning. Public figures are a historical snapshot, not live production data.
What is checked before shipment?
The source shows CMM measurement, an inspection report and shipment. Agree the critical dimensions, acceptance criteria and records for your part.
Explore the quality workflow and production monitoring shown in TCM’s company profile.
Interactive explanation of the documented workflow. Historical 2021 figures, not live factory data. Internal software rules are not reproduced.
Quality management system
Select a system node, or play the engineering-to-shipment sequence.
CNC ↑ Shop-floor reporting
CAD → CAM → CNC → CMM → Inspection report → Shipment
Production scheduling & monitoring
Scheduling allocates work by machine and day. Shop-floor progress feeds the planning view. Select a row to inspect a historical dispatch entry.
Dispatch schedule · 14–17 September 2021
| Machine | Date | Recorded work |
|---|---|---|
| 2021-09-14 | Z2360AJ1011 | |
| 2021-09-15 | Lower base | |
| 2021-09-16 | Lower base | |
| 2021-09-17 | Lower base |
Selected dispatch: —
Historical dashboard · 2021
Source: TCM company introduction 2023, pages 7–8. The pictures establish the displayed workflow and indicators; they do not specify scheduling algorithms, validation rules or software integrations.
OEM / RFQ
Start with one part.
Wayne Chiu coordinates your OEM enquiry with TCM in Taiwan and CCM in China. No drawing is required to start.
Wayne Chiu
Foreign Trade Sales Director
One contact for commercial and technical coordination.
TCM · Pingtung City, Taiwan
CCM · China
+886 8 752 1268