Responsible role
Loading workflow gate
Order / drawing revision check: confirm engineering documents and responsible people.
Start at the first gate. Every action creates a record.
Action records are saved in the central admin area.
Fixture and buffer production / Process validation
Deliver five now. The other five need lot traceability, revision control and clear conditions for future use.
Process demonstration workspace · Sources and manufacturer confirmation
Responsible role
Order / drawing revision check: confirm engineering documents and responsible people.
Start at the first gate. Every action creates a record.
Action records are saved in the central admin area.
Engineering status / Order delivery
Times are exercise parameters, not measured manufacturer savings. Export the full action path or review it in the central admin area.
| Potential bottleneck | Improvement in this version | Problem addressed |
|---|---|---|
| Promise a date as soon as stock appears | Count only compatible, unreserved and released quantities as available | Avoid promising the same stock twice |
| Issue old stock after a design revision | Quarantine the old revision, then assess compatibility, rework or remanufacture | Do not automatically scrap or release superseded stock |
| Evaluate ten-part batches only by saved setup time | Include material commitment, fixture investment and remaining operations | Compare repeat-order savings alongside the current investment |
These are the Demo workflow proposals, not findings of defects in the manufacturer system. The manufacturer may retain, revise or reject each proposal.
Every gate must identify the revision, owner, required input, retained evidence and conditions that block the next step.
Shimao (predecessor of Yongmao) · China factory · User supplied
Haas · Multi-part fixture concept — Equipment-maker methodology reference, not measured Shimao cycle times.
This version follows the supplied case conditions and public processes. Manufacturer data is required to verify dimensions, layout, interlocks, formal permissions and cycle times at 1:1 validation. Actual machinery must be operated under manufacturer procedures.