PRODUCTION LABEngineering workspace · v2.5.0

Multi-machine tending / Process validation

Multi-machine tending and incident closure

Connect 50 machining centers with engineering preparation, tending cycles and quality disposition.

View 3D Operation

Process demonstration workspace · Sources and manufacturer confirmation

Responsible role

Loading workflow gate

Work order and NC revision: confirm engineering documents and responsible people.

Start at the first gate. Every action creates a record.

Action records are saved in the central admin area.

Engineering status / Order delivery

Can this order be released now?

  1. Work order and NC revision
  2. Tools / fixtures / first article
  3. Tending and support allocation
  4. Tending circuit and incidents
  5. Last-good-part traceability
  6. Correct and retest
  7. Quality approval and delivery
Action log and responsibility handoffs

    Times are exercise parameters, not measured manufacturer savings. Export the full action path or review it in the central admin area.

    Engineering workflow improvements

    Potential bottleneckImprovement in this versionProblem addressed
    Staff by machine count aloneCheck service time, cycle time and support coverage togetherPrevent machines waiting despite nominal staffing coverage
    Quarantine the entire five-machine groupDefine suspect parts by machine, time and lotExpand quarantine if a common cause remains possible
    Release immediately after correctionRetest first, then require quality approvalRequire a second check between disposition and release

    These are the Demo workflow proposals, not findings of defects in the manufacturer system. The manufacturer may retain, revise or reject each proposal.

    Complete process handoffs

    1. 01Work order and NC revision
    2. 02Tools / fixtures / first article
    3. 03Tending and support allocation
    4. 04Tending circuit and incidents
    5. 05Last-good-part traceability
    6. 06Correct and retest
    7. 07Quality approval and delivery

    Every gate must identify the revision, owner, required input, retained evidence and conditions that block the next step.

    Manufacturer review and scope of 1:1 scope

    Case references and public evidence

    Sanxie · China factory · Location and layout await manufacturer confirmation

    • User supplied: China factory, 50 machining centers; each operator tends 5 machines.
    • Ten direct tending positions are calculated as 50 / 5. Programming, setup, quality, maintenance and relief still need separate staffing.
    • Not yet supplied: machine roster, floorplan, actual NC and shift cycle times. This scene does not claim to replicate the real factory.

    Vorne · OEE Calculation method — Industry methodology reference, not Sanxie production records.

    Three inputs to replace with real factory data next

    1. 50 machine models and travel ranges, fixture and loading photos
    2. At least one shift of cycle, walking, tool-change and alarm records
    3. Last-good measurements, quarantine boundaries and quality-release ownership

    This version follows the supplied case conditions and public processes. Manufacturer data is required to verify dimensions, layout, interlocks, formal permissions and cycle times at 1:1 validation. Actual machinery must be operated under manufacturer procedures.

    Versions and review