BYTE TCM

Jing Mao · BYTE TCM · Manufacturing cooperation

Precision parts.
Start with your drawing.

Precision components, tooling and OEM prototype discussions for UAV, robotics and equipment teams. Start with a drawing, review the manufacturing requirements, and agree on a practical next step.

Open 3-scene presentation ↗ Watch the narrated demo · 90 sec ↗

Jing Mao / 京茂機電科技股份有限公司 · BYTE TCM
Business contact: Wayne Chiu

Real manufacturer images / source-linked experience

See the work behind the conversation.

Aerospace machining references, hands-on production and inspection, and the equipment behind them. Each record separates what the source shows from what a new project still needs to qualify.

京茂製造實績與現場:以下為原官網公開照片與能力資料,不是示意生成圖。已展示的加工經驗可供會前評估;新案的客戶、零件規格、交付與驗收結果需另行確認。

These are public manufacturing references, not independently verified customer success stories. We do not infer contract values, flight qualification, production output or current certification from photographs.

Supply experience / user-confirmed relationships

Repeat supply requires more
than a good first sample.

The user-provided account confirms stable supply and conformance to these customers’ requirements. An internal weekly record provides a dated view of order and delivery activity; it does not by itself measure long-term delivery or quality performance.

使用者確認:持續穩定供應並符合客戶要求。提供的 2026/10/12–10/16 訂單及交貨紀錄可支持當週往來活動。公開頁僅摘錄可辨識的往來簡稱,不公開金額、數量或帳款內容;準交率、驗收率及長期連續供應期間仍需逐案紀錄支持。

Customer name as recordedEvidence visible in the supplied weekly recordRelationship scope
千附Orders and deliveriesUser-confirmed: ChenFull Precision. Specific programme remains undisclosed.
智相Orders and deliveriesUser-confirmed: AWISE. Supplied part scope requires record review.
保貴Delivery entryUser-confirmed: Pao Kuei Machinery. Actual work scope requires record review.
惠斯頓Delivery entriesUser-confirmed: Whitston. No downstream customer relationship is inferred.

Another name in the image remains unverified and is omitted pending confirmation. No customer logo, endorsement, contract value or named UAV programme is implied.

Aerospace quality experience

AS9100:D certification history

A manufacturer-published AFNOR certificate documents a historical certification period for precision machining and sales of molds and metal parts.

Displayed certificate expired 14 March 2023. Current certification status is not established by that copy.

View certificate images, scope and dates →
Cross-industry manufacturing

Precision consumables & carbon fiber

Semiconductor precision-consumable supply is confirmed by the user-provided account. Carbon-fiber machining is listed on BYTE’s official machining page.

These support different experience categories and are not presented as a single aerospace project.

Semiconductor supply experience →
Carbon-fiber machining scope →

Taiwan ↔ US company roles / 六家公司所在地與台美對照 — company destinations confirmed by the user; comparisons explain roles, not equivalence.

What we can discuss

Start with the component.
Define the engineering work.

01 / Precision components

From drawing to machining review

Discuss mechanical parts, brackets, housings and fixtures against your material, tolerance, quantity and inspection requirements.

Application examples for evaluation; no specific UAV programme or flight-qualified part is asserted.

02 / Tooling & custom parts

Established product foundations

BYTE’s public catalogue covers cam units and die components, including custom cam solutions. Use these references to start a tooling or custom-component discussion.

Browse BYTE products and OEM material →
03 / Prototype to small batch

Define a buildable work package

Review DFM questions, process choices, quotation inputs and acceptance criteria before commissioning samples or a small production lot.

Capacity, cost, engineering scope and delivery are confirmed per project.

Capability / evidence / next verification

Make every capability traceable.

Capability basisSourceBefore project approval
CNC machining, engineering and measurement supportBYTE TCM aviation machining page ↗
Company-published capability statement
Confirm equipment envelope, material, tolerance and inspection plan for the actual part.
Cam units, tooling components and custom cam workBYTE TCM die-components page ↗
Company-published product statement
Check drawing revision, model fit, configuration and supply scope.
Overseas OEM / custom manufacturing experienceCompany introduction supplied by Wayne Chiu; BYTE showcaseAgree which reference cases can be shared and who owns the design and manufacturing work.
Smart Tools network participationParticipation register ↗
User-confirmed, 20 Oct 2026
Named counterparts, matching decisions and contracts are confirmed separately.
Quality, origin and qualification

Official pages describe quality-system credentials. Current certificates, their scope and expiry must be checked for a specific contract. Manufacturing location, component origin and traceability are assessed per item; this page does not certify an entire aircraft or a non-China configuration.

Source review: 20 October 2026. The displayed AS9100:D and ISO 9001:2015 certificate copies expired on 14 March 2023; current renewal evidence is pending. Published manufacturer claims are distinct from independent qualification. A supplier listing or network participation is not a government endorsement.

Taiwan–US forum / pre-event matching

Define the first part.
Review a scoped quotation.

BYTE seeks pre-forum introductions to UAV, robotics and hardware teams needing mechanical-component manufacturing, prototype machining or tooling support.

會前目標:向秘書處提交中英能量介紹,由美方團隊評估意願,安排技術會談。若雙方形成合作範圍與行動共識,再評估論壇現場 MOU 簽署;目前未宣稱已媒合、已獲邀簽署或已有供貨合約。

Demand in the supplied DMBYTE discussion scope · engineering proposalWhat must be supplied first
Jaia Robotics / small surface vehiclesSensor brackets, mounting interfaces and enclosure machining.Geometry, marine material requirements, sealing design and corrosion criteria.
Descrai / smart eyewear and Linux baseBase enclosure, mechanical interfaces and assembly fixtures.Envelope, weight, heat path and electronics keep-out zones. No optics or Linux development capability is implied.
Zensys / smart ventilation prototypeMachined prototype structure, motor mounts and test fixtures.Fan geometry, tolerances, control-team responsibilities and actual target date. No motor/control delivery is assumed.

These are proposed fit assessments based on DM p.2, not confirmed customer requirements or partnerships. Medical instruments need a separate quality and process review before inclusion.

A small first work package

One component or fixture; one agreed drawing revision; a manufacturing feasibility review; then a scoped prototype quotation with an inspection plan.

Buyer input: drawings, material, quantity, target date, acceptance criteria and disclosure limits.

Proposed 90-day action framework

Agree counterpart and NDA → review requirement → agree prototype scope and quotation → define the build and verification decision.

Dates, funding, ownership and deliverables are negotiated. This is not a promise that a physical prototype will be delivered within 90 days.

MOU preparation checklist / 會前需確認
  • Named legal parties, authorized signatories and technical/commercial owners.
  • The specific component or problem, intended output and exclusions.
  • NDA, drawing and data permissions, IP terms to be settled in the definitive agreement.
  • Milestones, next meeting and the owner of each follow-up action.
  • Organizer’s MOU template, review deadline and on-site eligibility.

請秘書處提供適合京茂的需求摘要、會前對接安排、MOU 範本與送審期限。簽署以雙方及主辦方確認為準。

Two workstreams / one accountable scope

How BYTE joins the cooperation proposal.

A / Evidence & capability

Build the manufacturing capability pack

Provide agreed machining ranges, public product references, relevant cases and quality documents. Smart Tools connects the evidence to a demand–capability assessment and records gaps.

Output: a source-linked capability card and a list of information still needed.

B / DFM & prototype planning

Turn a requirement into a scoped next step

Review the drawing and required outcomes, identify manufacturing questions, and prepare quotation and sample-planning inputs. Contracted engineering and manufacturing follow an agreed scope.

Output: a manufacturing review and, when agreed, a prototype work package with acceptance criteria.

The proposal suggests a 30-day digital review package followed by a 90-day prototype action plan. Timing starts after scope, inputs and access are agreed. Physical builds, certification, pricing and delivery need separate engineering and commercial agreement.

A practical first conversation.

01 / Share the requirement

Drawing + intended outcome

Explain the component, application and constraints. Identify what may be disclosed before sharing confidential drawings.

02 / Review the fit

Evidence + open questions

Confirm the manufacturing scope, technical gaps, material and origin requirements, and acceptance method.

03 / Agree the next delivery

Owner + scope + decision

Agree a quotation, DFM review or sample work package with named responsibilities, a schedule and a clear acceptance decision.

Prepare a useful brief

What to bring.

  • Drawing or part reference and revision
  • Material, dimensions and critical tolerances
  • Prototype and expected batch quantities
  • Target date and delivery destination
  • Inspection, documentation and traceability requirements
  • Any manufacturing-location or component-origin constraints

For forum or institutional coordination, include the demand owner, permitted disclosure scope and the decision you need from the manufacturing team.

Let’s define the work.

Wayne Chiu
Jing Mao / BYTE TCM
ckchiu@bytetcm.com

The existing BE PASSIVE form opens with BYTE and this page’s context. Review the details and consent before submitting. Requests are saved for the existing coordination team; no automatic email is sent to a supplier or institution.

Take the evidence with you.

中英能量介紹 / Forwardable bilingual brief → · Image and claim provenance JSON →

Capability brief v1.1.0 · 20 October 2026. Forum registration, enterprise matching and any MOU are handled through the organizer’s confirmed process. Network participation does not establish a completed match or a supply contract.

Read the original Taiwan–US forum documents ↗

UAV integration partner assessment / 合機 (Hé Jī) 五人團隊

Pair a scoped precision-manufacturing requirement with a source-led UAV integration review. Team size is user-confirmed; member names and succession direction are user-confirmed; individual duties and project commitments remain to be confirmed.

合機 (Hé Jī) × BYTE:能力、交付角色與地面台架試點 →

UAV Component Localization & DFM

Bring the drawing before choosing the manufacturing route: brackets, housings, precision mechanical parts, fixtures and inspection planning. The first proposed output is a drawing-feasibility review, open questions and an inspection-plan outline.

Buyer inputs: drawing revision, material, dimensions, tolerances, finish, sample quantity, intended civil use, origin restrictions and acceptance requirements. Actual capacity, MOQ, price, lead time and technical signatory are unknown until reviewed.

BYTE TCM’s official quality page describes CNC machining and CMM capability (P2 manufacturer statement, checked 21 October 2026). Displayed historical certificate copies expired on 14 March 2023; current AS9100 and ISO 9001 validity remain unverified. This scope does not claim flight-controller, thermal-chip or motor production, an aircraft-qualified part or a UAV supply contract.

Original machining and quality evidence · SRC-21 · Manufacturing network role · Component requirements · Discuss a drawing and DFM requirement →