01 / HISTORICAL SUPPLIER SOURCE · P2
HISTORICAL CASE / COMPLETE ACCOUNT
Asia's first? A hydrogen-powered unmanned helicopter prepares to fly beyond limits
Read the dated source material, inspect the original references, and separate historical claims from a current project requirement.
Historical original-supplier material. Current availability, configuration and responsibility are confirmed per project.

COMPLETE CONTENT / ORIGINAL COMPANY RECORD
See the details.
Inspect the source.
The original text, specifications, images and media are arranged below for direct reading. Company-published claims remain attributed to their source; they are not new test results or current delivery commitments.
02 / HISTORICAL SUPPLIER SOURCE · P2
Asia's first? A hydrogen-powered unmanned helicopter prepares to fly beyond limits
10 October 2020 2-minute read
Updated: 16 November 2022
03 / HISTORICAL SUPPLIER SOURCE · P2
The source reports a hydrogen-powered helicopter crossing Guishan Island with energy efficiency above 11 g/W, demonstrating Taiwan's integration capabilities.
original supplier expanded into fuel-cell applications and joined Yuan Ze University in the Ministry of Science and Technology-supported 2020 Green Energy UAV Innovation Competition. The team installed a fuel-cell system on an unmanned helicopter. The article calls it Taiwan's first hydrogen fuel-cell helicopter able to carry 10 kg, and presents it as evidence of domestic fuel-cell UAV integration capability.
Published figures and conditions are retained from the source. Confirm the exact configuration, test setup, date and applicable scope before using them as an acceptance requirement.
04 / HISTORICAL SUPPLIER SOURCE · P2
The article reports four months of development and a nearly 25 km round trip to Guishan Island. Five specified tasks included photographing the Guanyin statue, climbing the 401 high point, viewing Guishou Lake, Putuo Rock and the incense burner. It reports uninterrupted communication and a successful landing after the cross-sea mission.
Published figures and conditions are retained from the source. Confirm the exact configuration, test setup, date and applicable scope before using them as an acceptance requirement.
05 / HISTORICAL SUPPLIER SOURCE · P2
For the integrated Hycopterdrone series, the source states at least three hours of flight depending on airframe and payload, and 1.5–2 hours with a 10 kg load.
The reported challenge performance indicators include: (1) 100% green energy (2) Average efficiency above 11 g/W (3) Cruise power ≤700 W
Innovation and application integration: original supplier was founded to enable unmanned vehicles.
The article describes Topology as original supplier's flagship internationally patented system and claims compatibility with 90% of air, land and sea unmanned vehicles. It lists inspection, rescue, defense, security and small-to-medium rapid logistics, and proposes future civil and military cargo applications.
The company describes itself as a startup unmanned-system integrator combining mature and forward-looking technology for intelligent vehicle management. Its stated capabilities include software/hardware R&D, propulsion R&D, structural design and manufacturing, complete-vehicle integration and customised solutions. It welcomes collaboration on industrial unmanned-vehicle applications and development.
Postscript: Guishan Island challenge route planning
The challenge involved precision dropping and crossing the 401 high point (401 m above sea level). Planning needed windward and leeward parameter settings, plus heading and camera-direction changes to obtain the best views of the targets. The article thanks the organiser, Yuan Ze University and everyone whose support made the 2020 event possible.
Published figures and conditions are retained from the source. Confirm the exact configuration, test setup, date and applicable scope before using them as an acceptance requirement.
06 / HISTORICAL SUPPLIER SOURCE · P2
07 / HISTORICAL SUPPLIER SOURCE · P2
08 / HISTORICAL SUPPLIER SOURCE · P2
Latest articles
View all09 / HISTORICAL SUPPLIER SOURCE · P2
10 / HISTORICAL SUPPLIER SOURCE · P2
11 / HISTORICAL SUPPLIER SOURCE · P2
FROM THE RECORD TO YOUR REQUIREMENT
Define one useful
first output.
- What you provide
- The source, product or application you want to discuss, your location and the required outcome.
- What to define together
- A source-linked scope review with unresolved questions recorded.
Exact hardware and software versions, interfaces, operating conditions, budget, schedule and responsible people remain to be agreed.
SOURCE EVIDENCE / ORIGINAL RECORDS / CURRENT-USE LIMITS
Keep the claim connected to its source.
Complete retained source text and available media, presented in an English reading layout. Where a current-team illustration replaces an image on display, it is labeled and links to the unmodified original. Company statements remain attributed to the historical original supplier; they are not new test results, current certification or a quotation.
Original supplier source · Retained capture reviewed 20 October 2026 · P2 company-authored material. Product availability, firmware, licences, configuration, delivery and contracting parties must be confirmed per enquiry.
Historical company-authored article (P2). Publication/update labels and body chronology may differ. Reported range, accuracy, efficiency, dates and partnership claims are not independently revalidated in this migration or guaranteed for a new configuration.
The original-language capture remains available for comparison. Source documents and diagrams retain their original language and attribution.
Enquire with the source context attached.
Tell us the required model, mission, country, quantity, existing equipment, network/data restrictions and expected deliverable. Unknown details may be “not yet determined”.
Reference: 合機 (Hé Jī) / post/hydrogen-powered-unmanned-helicopter. BE PASSIVE receives this enquiry. The original company, manufacturer and product ownership remain unchanged; supply, technical responsibility and quotation are confirmed per project. No automatic external forwarding.
Historical phone numbers and contacts in the source text are retained as records; current availability is not confirmed.
Current coordination team and responsibility →CONTINUE EXPLORING







