BE PASSIVE / SITES
CONFIGURATION / EVIDENCE / DELIVERY

合機 (Hé Jī) supply-chain & mission integration review

Keep original product evidence connected to the exact revision, interface, data path and deliverable being requested.

21 October 2026 · evidence dataset 1.0.0

Read original evidenceDiscuss exact requirement

Start with the retained product, then freeze the configuration.

合機 (Hé Jī) publishes GNSS/RTK, communication, ground-station, payload and Topology material. These are manufacturer statements, not independent qualification, a guaranteed replacement or a maritime detection product.

SRC-16 · P2 · checked 2026-10-21 SRC-17 · P2 · checked 2026-10-21
Original categoryRetained evidenceRequest before selection
Positioning / navigationHJ-Arrow / RTK product materialExact receiver revision, correction service, interfaces and test conditions
RF / ground controlTower / Drone Link / HGCS source materialExact radio and firmware, local approval, endpoints, latency and loss recovery
Flight controlFlight-control source and documentsBoard, MCU, firmware commit, command boundary and regression evidence
Fleet platformTopology retained product explanationLicensed API, roles, hosting, offline behaviour and current availability
Delivery responsibilityFour-person team and disclosed backgroundNamed engineer, equipment, available time and acceptance signatory

What the first review can deliver

I / Proposed scope: one configuration manifest, interface boundary, HBOM/SBOM questions, seven data-control answers and a staged test plan. No staffing, budget, site, exact hardware or result is assumed.

  1. Who can read?
  2. Where is it stored?
  3. Who receives it?
  4. Who can update?
  5. Who can control?
  6. Can it operate offline?
  7. Where and by whom is post-processing performed?

Unknown: exact origin, firmware authority, current capacity, API rights, schedule, pricing and product-specific qualification.

Compare the component questions → · Check dated control scope →

Match the work to evidenced scope

CapabilityEvidenceOpen conditions / first deliverable
合機 (Hé Jī)P2: GNSS/RTK, IP Mesh/4G/5G links, GCS, payload categories and Topology. SRC-16 · P2 · checked 2026-10-21 SRC-17 · P2 · checked 2026-10-21 Model/revision, origin, firmware, endpoints, test report and current capacity unknown. Proposed first output: interface/configuration gap matrix.
Jing Mao / BYTE TCMP2: CNC machining and CMM. Displayed historical AS9100/ISO copies expired 2023-03-14; current validity unknown. SRC-21 · P2 · checked 2026-10-21 Drawing, material, tolerance, finish, quantity and acceptance required. Proposed first output: DFM questions and inspection-plan proposal. No electronics, motor or certified aircraft-part replacement established.
Brazil network referencesU: original product evidence not rechecked in this release. SRC-19 · I · checked 2026-10-21 SkyDrones, UAVI and Global Drones are research references. Data residency, complete BOM origin, price and availability remain unverified.

Alliance identity and project agreement are separate: 合機 (Hé Jī) takeover coordination and BYTE participation are user-confirmed. This work package has no confirmed supplier commitment.