BE PASSIVE / SITES
CONFIGURATION / EVIDENCE / DELIVERY

中國零件依賴 → 配置與替代審查

以精確料號、來源、版本及驗收比對候選能力;未知不轉成合格結論。

21 October 2026 · evidence dataset 1.0.0

閱讀原始證據討論精確需求

適用買方與交付邊界

適合買方、Tier-1、整合商及工程師帶一項精確料號進行來源與替換審查。這不是已合格供應商、即時庫存或價格清單;未知可直接填「尚未確定」。

買方提供:用途、地區、型號與版次、接口、數量、來源限制、驗收與時程。建議交付:來源矩陣、缺口清單、候選工作範圍與測試計畫;沒有實測就不宣稱替換成功。

依元件篩選需求

15 components

Download full comparison matrix · CSV
C01 · UNKNOWN / PENDING VERIFICATION

馬達

Propulsion selection

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Which exact motor P/N, revision and rated test conditions apply?
  2. Do all four 9A901.a thresholds and the UAV-specific scope apply?
  3. Where are the motor, magnets and winding materials produced?
  4. What bench report, temperature limit and batch traceability exist?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-01 · P1 · checked 2026-10-21 SRC-04 · S · checked 2026-10-21
C02 · UNKNOWN / PENDING VERIFICATION

磁材/稀土

Magnetic materials traceability

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which magnet grade and specification are required?
  2. Where were alloying, separation and magnet production performed?
  3. Can material certificates trace the delivered lot?
  4. What thermal and corrosion tests match the duty cycle?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-04 · S · checked 2026-10-21
C03 · UNKNOWN / PENDING VERIFICATION

電子調速器 ESC

Motor power control

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Which controller revision and paired motor are specified?
  2. Is it specially designed for a 9A901.a motor and are both 9A901.b thresholds met?
  3. Who controls firmware signing and rollback?
  4. Which voltage/current, thermal and fault tests will be supplied?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-01 · P1 · checked 2026-10-21
C04 · UNKNOWN / PENDING VERIFICATION

複合材料螺旋槳

Propeller and composite procurement

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Which exact drawing, pitch construction and length convention apply?
  2. Does any 9A901.c criterion apply to the carbon-fibre UAV blade?
  3. Can resin/fibre and manufacturing lots be traced?
  4. Which balancing, inspection and load-test evidence applies?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-01 · P1 · checked 2026-10-21
C05 · UNKNOWN / PENDING VERIFICATION

電芯

Energy storage selection

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. What cell maker, P/N, chemistry and lot are supplied?
  2. Where are cell manufacture and pack assembly performed?
  3. Which transport and safety documents match the exact pack?
  4. What capacity, ageing and temperature test conditions are documented?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-04 · S · checked 2026-10-21
C06 · UNKNOWN / PENDING VERIFICATION

電池管理 BMS

Pack safety and monitoring

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which controller ICs and board revision are in the BMS?
  2. Who can update its software and read telemetry?
  3. What protection and failure tests have been run?
  4. Can pack, cell and board origins be traced separately?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-04 · S · checked 2026-10-21
C07 · UNKNOWN / PENDING VERIFICATION

飛控

Flight-control integration

Candidate: 合機 (Hé Jī) · manufacturer category statement only

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Which board revision, MCU and firmware commit are proposed?
  2. Which control-code classification has the exporter reviewed?
  3. Are signed updates, rollback and command permissions documented?
  4. What SITL/HIL logs show safe behaviour on mission-computer failure?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-01 · P1 · checked 2026-10-21 SRC-16 · P2 · checked 2026-10-21
C08 · UNKNOWN / PENDING VERIFICATION

GNSS/RTK

Position and time reference

Candidate: 合機 (Hé Jī) · manufacturer category statement only

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which receiver and antenna P/N and firmware apply?
  2. Which correction service and geography are supported?
  3. What measured accuracy, load, environment and time basis are reported?
  4. What occurs when corrections or satellites are unavailable?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-16 · P2 · checked 2026-10-21
C09 · UNKNOWN / PENDING VERIFICATION

RF/天線/鏈路

Command and telemetry transport

Candidate: 合機 (Hé Jī) · manufacturer category statement only

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Which radio/antenna P/N, firmware and power setting are proposed?
  2. Which local spectrum approval matches this configuration?
  3. Does 9A012.e apply, including its controlled-aircraft prerequisite?
  4. What measured latency, loss recovery and endpoint list exist?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-01 · P1 · checked 2026-10-21 SRC-16 · P2 · checked 2026-10-21
C10 · UNKNOWN / PENDING VERIFICATION

光學/熱影像

Imaging and measurement payload

Candidate: 合機 (Hé Jī) · manufacturer category statement only

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which detector, lens, sensor and payload revision apply?
  2. Where are detector fabrication, lens manufacture and assembly performed?
  3. Which calibration and environmental reports match the mission?
  4. Who can read recordings and control payload updates?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-04 · S · checked 2026-10-21 SRC-16 · P2 · checked 2026-10-21
C11 · UNKNOWN / PENDING VERIFICATION

任務電腦

Onboard application computing

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which exact board, processor, memory, OS and SDK revisions are offered?
  2. What input voltage, power, thermal and mass limits apply?
  3. What workload-specific latency and memory measurements exist?
  4. How is compute isolated from flight-control authority?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-19 · I · checked 2026-10-21
C12 · UNKNOWN / PENDING VERIFICATION

邊緣 AI/模型

Local inference and model governance

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. What model hash, training-data rights and deployment licences apply?
  2. What dataset, hardware, load and metrics were used?
  3. What happens offline or under memory pressure?
  4. Can model changes be versioned, reviewed and rolled back?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-19 · I · checked 2026-10-21
C13 · UNKNOWN / PENDING VERIFICATION

地面站/C2

Mission supervision and command authority

Candidate: 合機 (Hé Jī) · manufacturer category statement only

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Which GCS revision, commands and role permissions apply?
  2. Where are endpoints, logs and backups hosted?
  3. What happens on lost C2 and reconnection?
  4. Which API/SDK is actually licensed and available for this version?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-17 · P2 · checked 2026-10-21 SRC-19 · I · checked 2026-10-21
C14 · UNKNOWN / PENDING VERIFICATION

韌體/OTA

Software release control

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: SRC-01

Validation questions / 驗證問題(技術欄位為英文)

  1. Who holds code-signing keys and can authorize an update?
  2. What firmware hash, SBOM and licences are delivered?
  3. Can updates be disabled and rolled back offline?
  4. Who has remote control and how is it audited?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-12 · P1 · checked 2026-10-21 SRC-19 · I · checked 2026-10-21
C15 · UNKNOWN / PENDING VERIFICATION

雲端/資料代管

Storage and post-processing governance

Candidate: UNKNOWN / not verified

Configuration fields / 完整配置欄位
FieldCurrent value / reason
exact_mpnnull — not verified
revisionnull — not verified
assembly_countrynull — not verified
component_originnull — not verified
subcomponent_originnull — not verified
firmware_originnull — not verified
data_flownull — not verified
lab_testnull — not verified
min_ordernull — not verified
lead_timenull — not verified
ownernull — not verified

Regulatory references: No category-level classification established

Validation questions / 驗證問題(技術欄位為英文)

  1. Who can read and administer data?
  2. Where are primary data, backups and processing located?
  3. Which third parties receive data and under what contract?
  4. Can offline operation and deletion be verified?

I / Interface and performance equivalence untested; Origin and current availability unverified

SRC-17 · P2 · checked 2026-10-21

將能力對到有證據的範圍

CapabilityEvidenceOpen conditions / first deliverable
合機 (Hé Jī)P2: GNSS/RTK, IP Mesh/4G/5G links, GCS, payload categories and Topology. SRC-16 · P2 · checked 2026-10-21 SRC-17 · P2 · checked 2026-10-21 Model/revision, origin, firmware, endpoints, test report and current capacity unknown. Proposed first output: interface/configuration gap matrix.
Jing Mao / BYTE TCMP2: CNC machining and CMM. Displayed historical AS9100/ISO copies expired 2023-03-14; current validity unknown. SRC-21 · P2 · checked 2026-10-21 Drawing, material, tolerance, finish, quantity and acceptance required. Proposed first output: DFM questions and inspection-plan proposal. No electronics, motor or certified aircraft-part replacement established.
Brazil network referencesU: original product evidence not rechecked in this release. SRC-19 · I · checked 2026-10-21 SkyDrones, UAVI and Global Drones are research references. Data residency, complete BOM origin, price and availability remain unverified.

聯盟身分與個案合作分開:航見接手安排及京茂參與依使用者確認;本頁工作包尚未獲廠商承諾。

自研、採購或合作整合

ChoiceWhen it fitsRequired evidence
Buy an exact partAn available revision meets declared interfaces and restrictionsPart-specific origin, documentation, licence and test results
Partner integrationExisting modules need bounded interface/firmware workAgreed responsibility, API rights and a reproducible test plan
DevelopCritical gaps justify engineering and lifecycle ownershipSkills, budget, equipment, IP and support owner; all currently unassigned