BE PASSIVE / SITES
CONFIGURATION / EVIDENCE / DELIVERY

民用海事無人機觀測:需求與驗收規格

合法觀測、時間同步、告警與可重播證據;能力缺口及未執行測試清楚標示。

21 October 2026 · evidence dataset 1.0.0

閱讀原始證據討論精確需求

用途、範圍與買方輸入

供港區、工業場域業主與民用整合商定義合法觀測、記錄及告警。無干擾、接管、攻擊、武器化或部署承諾;現有航電產品不代表已具無人機偵測產品。

需提供場地權限、隱私邊界、感測器盤點、合法參考事件、資料保存要求、預算及驗收人。場地、設備、人員、工期、費用、API 與授權目前均未確認。

I / 以下為可執行測試規格;所有物理與模擬試驗均未執行。

五層能力與缺口

LayerEvidence / applicabilityGap
Drone DetectionNo 合機 (Hé Jī) detection-product evidence establishedSensor model, lawful collection, calibration and performance unknown
Mission ComputerNo board/OS/model selectedPower, memory, latency, cooling and isolation unknown
C2合機 (Hé Jī) GCS / Topology category (P2) SRC-17 · P2 · checked 2026-10-21 Observation console integration/API/permissions unverified; no takeover
RF合機 (Hé Jī) link category (P2) SRC-16 · P2 · checked 2026-10-21 Telemetry transport is not passive RF drone detection; exact model and local approvals unknown
Edge AINo model or dataset selectedLicence, evaluation set, false/missed alarms and offline limits unknown

四種角色,尚未指定人員

RoleResponsibilityHandoff
Site owner / operatorPermission, reference events, privacy and acceptance needsSite brief → integrator
Systems integratorInterfaces, configuration, logging and safe failure behaviourFrozen configuration → test lead
Research / test leadCalibration, ground truth and reproducible resultsSigned evidence package → independent reviewer
QA / delivery coordinatorTraceability, acceptance record and unresolved gapsReviewer decision → buyer; supply still subject to agreement

可行性與介面規格

AreaProposed contractUnknown / blocking input
Success conditionLawful observations are replayable; detection quality is measured, not claimedBuyer must pre-agree detection rate, nuisance-alarm rate and conditions
Version manifestsensor P/N+revision, calibration, firmware hash, OS/build, software commit, model hashAll exact values unknown; freeze before any execution
Input / outputJSONL events: event_id, sensor_id, track_id, timestamp_utc, timestamp_source, clock_offset_ms, confidence, class_or_unknown, raw_ref, config_hashProtocol/transport/rate unknown; agree adapter and time tolerance
Power / installationDocument voltage, peak/average power, mass, cooling, enclosure and mounting envelopeUnknown; measured at bench, never inferred from TOPS
Latency / memory / offlineMeasure end-to-end timestamps and peak memory; bounded local queue and explicit overflow policyLoad, capacity, delay budget and recovery target unset
Security / updatesLeast privilege; audit every acknowledgement and update; signed version and tested rollbackAuthentication design, key owner and patch responsibility unset
HBOM / SBOM / rightsVersioned hardware/software lists and model/data/code licences; lawful dataset approvalDocuments and contractual rights absent
Dependencies / cost / scheduleNo cost or duration commitment before scope and equipment reviewFour people are roles only; skills, assets, budget and site not assumed

階段閘門

StageEntryExit / next decision
Desktop / offlinePermission for shared non-sensitive data; named reviewerSchema, assumptions and requirements reviewed; unresolved fields flagged
SITL / replayFrozen fixture, versions and success thresholdsReplay tests T01–T05 reported; simulation is not physical validation
HIL / ground benchActual sensors, calibration, power and safe test setupTiming, resources, offline and access results recorded
Lawful controlled siteSite/privacy/operation permissions; trained personnel and safety planT07/T08 measured under stated conditions; reviewer accepts or requests correction

測試與證據檔案

ID / stageInputMethodPass conditionEvidenceExecution
T01 / desktopApproved mock observations + schemaValidate required UTC timestamp, sensor ID, track ID, uncertainty, model/config hash and raw-record referenceAll required fields and references validate; bad records rejectedschema-report.jsonNOT EXECUTED
T02 / offline replayFrozen lawful reference dataset; licence recordedReplay identical records twice and compare emitted event IDs, ordering and hashesDeterministic replay; all input records accounted forreplay-manifest.json + event-log.jsonlNOT EXECUTED
T03 / time alignmentKnown clock offsets inserted into a fixtureCheck declared timestamp source and offset detectionOffsets beyond pre-agreed tolerance flagged; no silent mergeclock-offset.csvNOT EXECUTED
T04 / link lossLocal network fixture; no field aircraftDisconnect uplink, fill bounded buffer, reconnectNo remote command generated; documented drop policy; replay without duplicate incident IDsnetwork-test.json + capture manifestNOT EXECUTED
T05 / accessRole matrix and test accountsAttempt unauthorized read, acknowledgement and updateUnauthorized operations rejected and audited; authorized path recordedaccess-report.jsonNOT EXECUTED
T06 / calibrationExact sensor, reference instrument and permissionsRecord calibration revision and environmental conditionsCalibration within buyer-agreed tolerance; expired calibration blocks acceptancecalibration.csvNOT EXECUTED
T07 / controlled sitePermitted site and ground-truth observation planRun labelled authorized reference events plus no-event periodsReport TP, FP, FN, observation hours and uncertainty; thresholds agreed before runground-truth.csv + confusion-report.jsonNOT EXECUTED
T08 / evidence handoffRead-only export and version manifestIndependent reviewer replays sample incidents and checks hashesNo missing raw refs; matching configuration and complete audithandoff-manifest.sha256NOT EXECUTED

採購與既有能力邊界

Reuters 是部署消息,EU 是政策入口;都不構成招標。未找到具體招標編號或本案合約。SRC-05 · S · checked 2026-10-21 SRC-06 · P1 · checked 2026-10-21 SRC-07 · P1 · checked 2026-10-21

Full research and procurement references →

將能力對到有證據的範圍

CapabilityEvidenceOpen conditions / first deliverable
合機 (Hé Jī)P2: GNSS/RTK, IP Mesh/4G/5G links, GCS, payload categories and Topology. SRC-16 · P2 · checked 2026-10-21 SRC-17 · P2 · checked 2026-10-21 Model/revision, origin, firmware, endpoints, test report and current capacity unknown. Proposed first output: interface/configuration gap matrix.
Jing Mao / BYTE TCMP2: CNC machining and CMM. Displayed historical AS9100/ISO copies expired 2023-03-14; current validity unknown. SRC-21 · P2 · checked 2026-10-21 Drawing, material, tolerance, finish, quantity and acceptance required. Proposed first output: DFM questions and inspection-plan proposal. No electronics, motor or certified aircraft-part replacement established.
Brazil network referencesU: original product evidence not rechecked in this release. SRC-19 · I · checked 2026-10-21 SkyDrones, UAVI and Global Drones are research references. Data residency, complete BOM origin, price and availability remain unverified.

聯盟身分與個案合作分開:航見接手安排及京茂參與依使用者確認;本頁工作包尚未獲廠商承諾。